My To-Do List

1 – Replace exhaust system on the Sentra.
2 – Replace all four struts on the Sentra, and possibly the front control arm bushings.
3 – Put new wheels and tires on the Sentra.
4 – Replace heater core in the Ranger.
5 – Finish installing electric radiator fan in the Ranger.
6 – Finish installing under-hood battery charger in the Ranger.
7 – Recycle cardboard boxes currently taking up space in the back yard and driveway.
8 – Stack lumber more neatly in the back yard.
9 – Install under-hood battery charger in the Metro.
10 – Change the oil and filter in the Protege.
11 – Unpack new shop vac.
12 – Assemble Adirondack chair kit.
13 – Assemble freestanding hammock.
14 – Put 10-gallon aquarium on Freecycle.

1-8 have to be done by the end of next week.

BTW, I’m doing all the automotive work myself, not having a shop do it.

Share this post:
  • email
  • Print
  • Digg
  • del.icio.us
  • Facebook
  • LinkedIn
  • PDF
  • Ping.fm
  • StumbleUpon
  • Tumblr
  • Twitter
  • Yahoo! Bookmarks
  • Reddit
  • FriendFeed
  • Posterous
This entry was posted in Automotive, Miscellaneous. Bookmark the permalink.
blog comments powered by Disqus